
Built to withstand real-world attacks
Every Elitemark deliverable passes OWASP checks, uses HTTPS everywhere, sanitises inputs, and ships with rate-limited endpoints. Your business stays out of the news for the right reasons.
Elitemark builds custom manufacturing software — combining ERP, MES (manufacturing execution) and shop-floor data capture — for Indian discrete and process manufacturers across Pune, Chakan, Bhosari, Ranjangaon, Waluj, Nashik, Mumbai and Bangalore. Our manufacturing platform unifies sales-forecast → production planning → material planning (MRP) → work orders → shop-floor execution → quality → dispatch → costing in a single system of record.
Every manufacturing engagement starts with a plant audit — we walk your shop floor with your production manager, quality head and CFO, map the current process (Excel-based scheduling, WhatsApp-based job cards, manual QC), and design a target-state that eliminates duplicate data entry and gives you a real-time OEE dashboard on your phone. We then implement in phases so the plant keeps running while the new system rolls in.

These six commitments are baked into every project, regardless of package or price — because a slow, insecure, un-indexed site is a liability, not an asset.
90+ Lighthouse scores, sub-2s load times, Core Web Vitals green across the board.
OWASP Top-10 hardened, SSL, WAF, encrypted storage, regular vulnerability scans.
Semantic HTML, JSON-LD schema, sitemap, geo-targeted meta — built to rank in Pune & India.
Modern React, Node, cloud-native. Ready to scale from MVP to millions of users.
Every pixel hand-crafted. No cookie-cutter templates, no generic AI aesthetics.
AMC plans, WhatsApp support, monthly reports. We stay after the site goes live.
Our manufacturing framework covers sales order, forecast and planning, multi-level bill of material (BOM), routings, work centres, MRP (net material requirement across on-hand, on-order and reserved), production planning (make-to-stock, make-to-order, engineer-to-order), work order and job card generation, shop-floor data capture (manual, tablet-based, barcode, RFID, IoT / PLC), in-process and final quality with SPC charts, batch / lot / serial-number tracking, sub-contracting (SC-BOM and outward register), inventory and warehouse, dispatch and invoicing (GST + e-invoice + e-way bill), and finance / costing (standard cost, actual cost, variance analysis).
Every module is designed for the way Indian factories actually run — labour attendance drives job-card costing, supervisor mobile apps replace the paper job traveller, and OEE / downtime dashboards live on the plant-head's phone instead of in a month-end Excel.
Supervisors update work order status, downtime and rejections from a factory-hardened tablet.
Auto-capture from CNC / PLC / SCADA where available — no manual production entry.
Availability × Performance × Quality on the plant-head's phone, updated by the minute.
SC-BOM, outward register, GST-compliant SC challan and reconciliation with the sub-contractor.
For discrete manufacturers (auto components, engineering parts, electronics), we implement job-shop / batch scheduling, multi-operation routings, tool-life tracking, drawing revision control and PPAP / APQP documentation. For process manufacturers (chemicals, pharma, food, FMCG), we implement recipe management, batch potency and expiry, yield calculation, tank / silo tracking and 21 CFR-style audit trails.
Both models share the same core ERP — but the industry template ensures your team is not fighting the software from day one.
Most manufacturing ERPs fail because the shop-floor data is fake — supervisors fill in Excel at end-of-shift to catch up with the system. We solve this with a factory-hardened tablet app that supervisors actually use — big buttons, offline sync, barcode scanning, one-tap downtime and rejection capture, and a WhatsApp escalation when an OEE threshold breaks.
Where CNC / PLC / SCADA is available, we integrate directly for automatic cycle count, downtime and quality feedback. That kills the debate about whose numbers are correct — because the machine is the source of truth.
Standard-cost vs actual-cost variance is the single most valuable output a manufacturing ERP can produce — but most Indian factories still calculate it monthly in Excel because their ERP data is unreliable. With Elitemark's manufacturing platform, standard-cost / actual-cost variance is a live dashboard: material variance, labour variance, overhead absorption, scrap / yield loss and sub-contracting variance — every job, every day.
MDs get a mobile dashboard covering booked orders vs plan, WIP value, on-time delivery, OEE by shop, top downtime reasons and monthly P&L view — without waiting for the finance team's month-end pack.
The manufacturing ERP integrates with Tally / Zoho Books / Busy for statutory accounts (if you prefer to keep books there), with the IRP for e-invoicing and NIC for e-way bill, with your EDI-based OEM customers for order / ASN / invoice exchange, and with WhatsApp / SMS gateways for dispatch and payment notifications.
For sub-contracting, dealer and distributor networks, we ship extranet portals with per-partner access — so your dealer sees only their orders, dispatches and outstanding, and cannot see a competitor's data even if they know the URL.
Elitemark Software Pvt Ltd is a leading custom software development company in Pune, India, building enterprise-grade software products for manufacturing, distribution, healthcare, education, retail and services businesses across Maharashtra and pan-India. Since our founding we have shipped ERP systems, CRM platforms, HRMS suites, school ERPs, hospital management systems and manufacturing MES software for 120+ SMEs and enterprises — hosted on-premise, on private cloud and on AWS / Azure / Cloudflare.
Our software delivery model is transparent, fixed-scope and outcome-driven. Every engagement starts with a business analysis workshop that captures your existing workflow, pain points, integrations and reporting needs — followed by a written Software Requirements Specification (SRS), UI wireframes, a milestone-based development plan and a fixed commercial proposal. During build we run two-week sprints on a private staging environment, so you see progress every fortnight and can course-correct without change-order friction.
On the engineering side, our Pune team is fluent across the modern software stack — React, Next.js, TypeScript, Node.js, .NET Core, Java Spring Boot, Python Django, PostgreSQL, MySQL, MongoDB, Redis, Docker, Kubernetes, and REST / GraphQL APIs. We follow SOLID design, git-based version control, code reviews, automated tests, CI/CD pipelines and role-based access control on every project — because enterprise software must be maintainable, secure and audit-ready from day one.
Software has to earn its keep every quarter, not just at launch. That is why we architect every Elitemark build around three engineering principles: modularity so each department can evolve without breaking others, observability so problems are caught before your users report them, and portability so the same code can move from an on-prem Windows server to a Kubernetes cluster on AWS or Azure with a single deployment script. In practice this means we ship structured application logs, Prometheus / Grafana metrics, uptime and error monitoring on Sentry / BetterStack, automated database backups with point-in-time recovery, and infrastructure-as-code (Terraform / Pulumi) — so your DevOps team can audit and reproduce every environment without a phone call to us.
Beyond raw engineering, Elitemark operates as an accountable software partner for the Pune, Mumbai, Nashik, Nagpur, Bangalore, Hyderabad, Delhi, Ahmedabad and Chennai belts. Our project managers work in your time zone and language, we run steering committees every fortnight for medium and large builds, and we produce written status notes so procurement, finance and IT leadership can each see progress from their own lens. Whether the project is a 6-week MVP or a 12-month multi-module ERP, you always know what is shipping this sprint, what is queued for the next, what is blocked and who owns the fix.
A large portion of our engagements are re-writes of software that other Indian vendors could not maintain — usually because the original developers left, the documentation was thin, the database was undesigned, or the codebase was tangled with copy-pasted logic. When Elitemark inherits such a project, we do a two-week rescue audit that catalogues the endpoints, the data model, the security holes and the business logic, then presents a phased modernisation plan with a fixed timeline and cost. Clients typically recover their software within one quarter, migrate to a cleaner stack within two, and add new revenue-facing features within three — without ever taking their business offline.
Elitemark's Pune software team is intentionally small, senior and stable — every project is staffed with at least one architect who has shipped a comparable system in the last 24 months, backed by mid-level engineers, a dedicated QA lead and a project manager who runs your stand-ups, demos and steering committees. We avoid the pyramid-shaped staffing model that most Indian services companies use, because it silently pushes the hardest decisions to the least experienced people on the team. The trade-off is that we are deliberately selective about the number of concurrent engagements we accept — but the pay-off is that your project actually ships on time, with code you can hand to a future in-house team without embarrassment.
Our documentation and hand-over standard is another quiet differentiator. Every Elitemark engagement ends with a full technical dossier — architecture diagrams, entity-relationship diagrams, API reference (OpenAPI / Swagger), environment setup guide, deployment runbook, incident response playbook, user manuals in English and Hindi / Marathi where required, admin training videos, and a written 90-day roadmap of the improvements we recommend post-launch. Clients who eventually build an in-house team can onboard a new developer in under a week, and clients who continue with us on AMC benefit from the same rigour when we add new modules two or three years later.
We work with clients ranging from bootstrapped founders with a single-page MVP idea to listed enterprises running multi-country operations, and our commercial models flex to match. Fixed-scope milestone billing works best for well-scoped MVPs and rewrites; dedicated squad / T&M works best for long-running product roadmaps where scope evolves month to month; and hybrid staff-augmentation lets you add Elitemark engineers into your own Jira / GitHub / Slack so you scale capacity without losing product ownership. In every model our commercials are transparent — day rates published in the contract, no surprise per-seat license fees, no exit penalty if you decide to bring the team in-house, and no long-term retainer lock-in that punishes clients for succeeding and outgrowing the original scope of work with our Pune team.

We pick technologies that will still be maintained five years from now — no experiments on your budget. Every stack decision is documented and reversible.


Every Elitemark deliverable passes OWASP checks, uses HTTPS everywhere, sanitises inputs, and ships with rate-limited endpoints. Your business stays out of the news for the right reasons.

Pune-based support team available 6 days a week. Bug fixes, content edits, SEO tune-ups and hosting management — all handled through a single WhatsApp thread.

Every project pairs a project manager, designer, full-stack engineer, and SEO specialist. No handoffs, no ticket queues — one team, one Slack channel, one accountable owner.
| What matters | Freelancer | In-house team | Elitemark |
|---|---|---|---|
| Delivery timeline | Unpredictable | 3–6 months hiring | 7–30 days |
| Design quality | Template-based | Depends on hire | Bespoke Figma UI |
| SEO built-in | Rare | Extra hire needed | Always included |
| Post-launch support | Disappears | Ongoing salary cost | AMC + WhatsApp |
| Total 1st-year cost | Hidden costs | ₹12L+ | From ₹15,000 |
| Accountability | Individual risk | HR overhead | Registered Pvt Ltd |
Custom manufacturing ERP / MES cost in India ranges from ₹12-25 lakh for a single-plant SME (up to 100 employees) with sales / inventory / production / quality / dispatch, to ₹40 lakh–₹2 crore for multi-plant enterprises with IoT / PLC integration, discrete + process lines, sub-contracting and OEM EDI.
SAP B1 and Odoo are excellent packaged ERPs — we implement Odoo where it fits. Elitemark's custom manufacturing ERP wins when your process needs multi-level sub-contracting matrices, dealer schemes, industry-specific quality templates, or a factory-hardened tablet app for shop-floor capture — things packaged products either lack or price per user very expensively.
Yes. Our engineering team integrates with common CNC / PLC / SCADA protocols (OPC UA, Modbus, MQTT, MTConnect) for automatic cycle count, downtime and quality feedback — killing the debate about whose numbers are correct.
A single-plant SME implementation goes live in 4-6 months in phases (Phase 1: sales + inventory + dispatch; Phase 2: production + quality; Phase 3: costing + MIS). Multi-plant enterprise projects run 8-12 months.
Yes. GST-compliant tax invoices, IRP-based e-invoicing, NIC e-way bill, GSTR-1 / GSTR-3B exports, TDS / TCS handling and Indian financial year support are built in and updated with every government notification.
Talk to Elitemark's Pune team for a fixed-scope proposal — no obligation, no jargon.